AUTOMOBILE FACTORIE - TANGER (MAROC)
Bringing together all of Valeo’s production activities in Morocco, this new industrial center, which covers a total area of 137,000 m2, including currently more than 40,000 m2 of production space, has two buildings.
The first (already operational since 2017) is dedicated to the production of lighting and wiper systems, the second hosts the production of thermal systems (radiators, ventilation systems, engine cooling systems, etc.) and assistance systems driving (steering wheel controls).
BUILDERS & PARTNERS Morocco carried out engineering, project management and CIM BIM and data management assignments on the 2nd building.
Industry
15 000 m2
Conception
Feasibility
Implementation
CIM BIM and Data Management
Construction economics
Coordination of Studies
Fluid engineering
Presynthesis/Technical and Architectural Synthesis
Site Management
Site Supervision and Coordination
Structure engineering
Support & guidance with environmental certification procedures
Architect : CABINET AGA